Ductile cast iron pipe as a problem solver

Ductile cast iron pipe as a problem solver

The Devoll hydropower project in Albania: Statkraft AS has built two hydropower stations on the River Devoll, some 70 km to the South-East of the Albanian capital of Tirana: Banjë and Moglicë. The two together will have a capacity of 256 MW and an annual production of around 729 GWh.

The right cast iron pipe system for every bedding

The right cast iron pipe system for every bedding

Cast iron pipes were the basic stock when it came to the installation of urban drinking water supplies 150 years ago. With increasing requirements from users for efficiency and simultaneously increasing chemical and mechanical loads, an innovative foundry industry responded with some sophisticated solutions.

Anergy networks with ductile iron pipes

Anergy networks with ductile iron pipes

The main focus of the so called Swiss Energy Strategy 2050 lies in the use of local, renewable energy sources. Their most important aims are a sustainable guarantee of energy supply, consistent development of existing energy efficiency potentials, reduction of CO2 emissions and full utilisation of existing potentials of new renewable energy sources.

Large-dimension interim pipeline with cast iron systems

Large-dimension interim pipeline with cast iron systems

Positive locking and flexible thrust-resistant systems have extended the range of application of ductile cast iron systems and shown that they can withstand all loads produced by internal and external forces. In the construction and during the operation of pipelines with restrained joints in tunnels and under bridges, when used with the application of trenchless installation techniques …

Spectacular pipe mounting in the vertical

Spectacular pipe mounting in the vertical

After a little more than a year of construction time, in September 2019 the new hydropower station in Finhaut, Switzerland, was able to be put into operation. However, achieving the Finhaut microgeneration unit took ten years overall: from project planning in 2008 until the start of construction work in summer 2018.

Implementing the sponge city principle

Implementing the sponge city principle

The effects of climate change have been more noticeable than ever before in Europe and also in Germany over the last couple of years. Long periods of high temperatures in combination with low rainfall in the spring and summer of 2018 and 2019 put a strain on us humans and also had visibly harmful effects on the natural world …